  1. Thx Lars, can't wait to get it finished. Floor was put in today, next week the framing should start.
  2. Floor is ready for pouring on Friday. Tomorrow the 2 footings for the lift needs to be inspected by the building department before the slab is poured. Floor will be sloped slightly downward towards the front with the difference from front to back of 3 inches over 39 feet.
  3. Weather slowed down the shop but we have the foundation done now. Next up is the slab.