I just bought some Global West sub frame connectors' for my 73 convertible.  I am not a welder and am going to have a shop install them. What would be an average cost to have them installed. I am in Michigan.

 

 

John J

Link to comment
Share on other sites

Don't know the prices in that neck of the woods but here is southern Ohio welding prices are all over the place ranging from  $75 to $120 an hour.  Also have to pay travel time to most of  them if they are coming to you.  I would figure no more than 2 to 3 hours tops between the prep time and actual welding provided the car is on a drive on lift.  I would try to get a fix price if you can.   It took me about 4 hours to do mine working under the car lying on a creeper. Car was on ramps and jack stands. 

Edited by Kilgon

Kilgon

 

 

"The only dumb question is the one not asked"

Link to comment
Share on other sites

I'd think a shop that does custom exhaust work could do it for you in under two hours. Make sure whoever does it has the car on a ramp lift, not a two-post lift with arms. 

 

 

Link to comment
Share on other sites

If the issue is with welding you could install them with bolts or so and then take it to any place that does welding like a muffler shop.

20160929_171923_edit2_small.jpg

 

1971 M-Code Mach 1 w/Ram Air, 408 stroker, 285/291 0.558" roller cam, Blue Thunder intake, TKO600, Hooker headers with electric cut-offs, FiTech EFI w/ RobBMC PowerSurge pump

Strange center section with Truetrac, 3.5 gear and 31 spline axles, 4-wheel disc brakes

Link to comment
Share on other sites

The prep and fitting time will be more than the weld. If you clean all the paint, sealer and crud off for them you save bucks. Get them fitting and if all they have to do is weld only an hour maybe at most. You might even consider using some sheet metal screws to hold in place. Drill some holes in the connectors where you can put in sheet metal screws into you rails. Then you drive over and all they do is weld. Take the screws out and plug weld the holes.

  • Like 1

When a man is in the woods and talks and no women are there is he still wrong??:P

David

Link to comment
Share on other sites

I am a welder, and Mine took 4 hours including jacking, leveling, cleaning the frame metal and welding them in. Just be careful near the gas tank. Good luck!

Link to comment
Share on other sites

2 hours ago, Omie01 said:

I am a welder, and Mine took 4 hours including jacking, leveling, cleaning the frame metal and welding them in. Just be careful near the gas tank. Good luck!

Im not a welder but it took me 5 hours max. Great improvment, having a lift is helpful. Welding almost upside down is not fun.  And as Omie01 says watch the gas tank.

Edited by Robsweden

For knowing your limit you have to pass it ::thumb::

 

Link to comment
Share on other sites

If you are thinking of lowering the car be cautious about installing the frame connectors. On my 73 vert I had installed eaton springs  1" drop springs. That drop with 225/60/15 BFGs on the front only left about 4" of ground clearance with the frame connectors in place. I really wanted Frame connectors on the convertible but now have to decide whether to go back to a stock height spring or get taller tires or some combination of both to get adequate ground clearance for everyday street use.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...