- Joined
- May 19, 2021
- Messages
- 1,356
- Reaction score
- 951
- Location
- Fort Mohave, AZ & So Cal (Upland)
- My Car
- 73 Grande will undergo three phase build process. Phase 1 is complete (driver). Phase 2 is interior/exterior restoration. Phase 3 is ++ performance.
Does anyone have any left over tubing? I only need like a 5’ piece or two 2.5’ pieces to finish my trans cooler. Can’t seem to locate a short piece on line. Thanks. Either 86426 or 91784 shipping address.