Slowest resto ever - Project AmsterFoose / Current subject: The roof

7173Mustangs.com

Help Support 7173Mustangs.com:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
A few things had to be re-attached to the bottom cowl before continuing.

First this, can't even remember what it's for. I only cut out 1 of the 2 spotwelds so it's still exactly in it's original spot:

image.png

Attached to the bottom was some kind of... whatever. I re-created it and welded it back making sure the hole to hang the heater from is exactly in the same spot:

image.png

I really did not want to weld upside down so I kept it in place from below with a magnet:

image.png

And I drilled 3 little holes to weld it from the top, I realise this could compromise the cowl but it will have to do:

image.png

The result so I can attach my heater in about 7 years:

image.png

Next up is fixing the upper cowl bit that I cut out, it needs quite a bit of patch work:

image.png

One of the patches has got to be one of the funkiest looking ones I made sofar:

image.png

 
Last edited by a moderator:
Wellllllll, a few months have passed and my cowl is fixed. That's the short version of this post. If you wanna know more details, keep on reading!

My last update ended with a funky looking patch. Well, the one after that was more challenging!

I made this patch:

1641152465277.png

To go here, on the RH side of the cowl:

1641152662154.png

And it worked out well:

1641152815753.png

After finishing welding the patches and fixing up other areas I prepared the bottom cowl with 3M welding primer:

1641153031984.png

Tack welding the top in place and securing its position:

1641153157506.png

And done:

1641153470213.png

Now I prepared the portion of the frame rail that goes on top:

1641153678674.png

Almost 30 plug welds were required for this part and I really was not looking forward to doing those coz it was still too hard. However, I experimented with my wire feed and have now found that with a small increase of the wire speed I can now make plug welds that fill in early one go!:

So I clamped it in place:

1641154000569.png

And welded it in:

1641154077700.png

Finally my cowl was finished:

1641154166467.png

Very happy I got this done. It was a lot of work but it saved me a lot of money and better it gave me better welding skills! :)
 
With the cowl finished on the last day of 2021 (feels great to have it finished last year) on the first day in 2022 I started on my RH quarter. I can see a bit of crap in the drop-off and you can be sure there is rust in the wheel well edge so that's all going to be replaced, just like I did on the left side.

It starts with drilling out welds at the back around th tallight panel:

1641155323853.png

Don't forget to create reference points if you need them:

1641155391987.png

And 15 minutes later:

1641155549788.png

Next is positioning the new drop-off panel. In my new one the 2 holes were about 0.5 - 1cm (that's metric!) off:

1641156141778.png

Use the superduper welding clamps and tack that sucker in:

1641156218367.png

Tacked:

1641156268058.png

More in a few months ;-)
 
Haha, that won't be any time soon! After the RH quarter I have to do my floors and last weekend I found out the battery apron needs work afterall... Then I need to close all the holes that the trim around the vinyl roof left behind. The vinyl ain't coming back so no need for holes... After all the welding is done it will be stripped completely and get dipped in acid and coated with primer. In the meantime the engine will get pimped. And then the fun proces of building a car will start. I think I'll get to that point in 1.5-2 years. That's being optimistic ;-)
 
More than a month has passed! What happened?

The drop off was finished:

1644872182985.png

Now it was time to see what the wheelhouse edge looks like: CRUSTY! I cannot imagine ANY 50 year old Mustang not having crusty wheelhouse edges. Therefore, for the life of me I don't understand why people "restore" a car and giving it beautiful paint and other upgrades without looking into this:

1644872320538.png

The top of the rocker and the bottom part of the edge seemed pretty decent so I'm going to leave those. In the pic below you can see the cut out edge in the top left corner:

1644872466466.png

Cuttin the new edge out of a new outer wheelhouse:

1644872735470.png

Test fitting and marking the cut in the old edge:

1644872871734.png

Cut and patch put in place (gotta love these clamps!):

1644873141757.png

Pro tip; drill these holes before you weld everything in place (I forgot...):

1644873294966.png

Welding done, new edge is in. No more rust:

1644873456207.png
Next up is fitting the quarter patch:

1644873590059.png

To be continued...
 
Made a bit of progress last weekend on the RH quarter. I'm really noticing increased skill now as this wheelhoude and quarter is going a lot faster than the other one, which was my first ever big welding job. Still slow coz I can really only work on my car once every 2 weeks but still... Anyways, I did this last weekend:

Used phosphoric acid to clean the rear of rust. Worked like a charm! Before and after:

IMG_6935.jpg

On to the actual quarter. Really, EVERY bit of sheetmetal you buy needs work, it is NEVER easy... However, this quarter only needed a small patch and some extra welds for strength (in my opinion):

IMG_6936.JPG

Finally ready for fitting and marking (that little seat is a true life-saver btw! For the europeans here, it's from LIDL, 35 euros only!):

IMG_7005.JPG

I fixed the panel using clamps and a few rivets, measured all my reference points 10 times over and then cut the new and old in one go with a 1mm thick disc. Works perfect:

IMG_7013.JPG

Then I remembered some holes that the P.O. made for the old and never coming back LPG setup. Frustrated by having to spend time on it now I figured it would save time later while I have better access now so I filled them:

IMG_7019.JPG

But I just had enough time left to fit the quarter patch and it sits there PERFECTLY fine. It meets all my reference points, very happy with how it fits:

IMG_7023.JPG

IMG_7026.JPG

So in the coming weeks I will be welding this baby in which concludes the big jobs on the rear and I can start looking forward to replacing the floor...

:eek:
 
Howdo! This weekend I worked on the quarter 2 days. The first day was awesome, tag welded the quarter, made sure I had perfect gaps in as many places as possible. It went really well, all of the 120 tags (I counted them!) except for 2 were beautiful, have a look:

IMG_7166.JPG

IMG_7167.JPG

The second day I wanted to get in all the spot welds. What fuckery! Had to do about 44 of them and about 8 popped loose. God I hated that sound so much I almost started throwing shit around my garage... Since I don't have a lift I have to get in really shit positions to weld, looking up and bad light. Also I have very little room next to the car. About 50 cm (less than 20 inch). Anyway, I did manage to get them all in before my time was up:

88658255-3B51-4A6D-BFA9-4658C1736AC6.jpg

My "office" yesterday:

IMG_7156.JPG

Now all that's left is welding the gap in the skin, guess I'll do that in a couple of nights or maybe in 2 weeks...

Very happy I'm getting this one off the list!
 
Last edited:
Back
Top