- Joined
- May 19, 2021
- Messages
- 1,367
- Reaction score
- 957
- Location
- Fort Mohave, AZ & So Cal (Upland)
- My Car
- 73 Grande will undergo three phase build process. Phase 1 is complete (driver). Phase 2 is interior/exterior restoration. Phase 3 is ++ performance.
https://www.defenseone.com/technology/2022/12/watch-b-21-unveiling-live/380399/
That was way cool. I was lucky to spend most of my adult working life working on the original B-2 and ending with being a team member who crafted the strategy to win the B-21 contract. That was the best 28 years of work. As my good friend use to say, “Time flies when you’re finding new and creative ways of blowing $#!% up!” Now my son continues the mission while I’m retired. I am continuing amazed at the technology we can create.
That was way cool. I was lucky to spend most of my adult working life working on the original B-2 and ending with being a team member who crafted the strategy to win the B-21 contract. That was the best 28 years of work. As my good friend use to say, “Time flies when you’re finding new and creative ways of blowing $#!% up!” Now my son continues the mission while I’m retired. I am continuing amazed at the technology we can create.