- Joined
- May 19, 2021
- Messages
- 1,374
- Reaction score
- 971
- Location
- Fort Mohave, AZ & So Cal (Upland)
- My Car
- 73 Grande will undergo three phase build process. Phase 1 is complete (driver). Phase 2 is interior/exterior restoration. Phase 3 is ++ performance.
My wife is a eBay reseller, so I am her Thrift store helper. Yesterday, I scored these 4 paperback DUY books for $1 each. If anyone just has to have it, after I read it, I’ll pass it along. I enjoy reading these period-correct books, which used vehicles like ours as the basis of the instructions. Steve